Search on this blog

Search on this blog

COMMERCIAL DEVELOPMENT INSTALLATION

From first fix.
Through to handover.

Security and network infrastructure installed as part of your commercial construction or major refurbishment programme.

Survey · First fix · Second fix · Commissioning

INSTALLATION IN PROGRESS
The work behind
a connected site.
10-second installation film
Illustrative scenes

COMMERCIAL DEVELOPMENTS / THE INSTALLATION SCOPE

Plan the technology before the finishes.

Containment, risers, doors and ceiling closures all affect the final system. We coordinate low-voltage cabling and security installation with the construction team, separating first fix, second fix and commissioning into clear work stages.

01

First-fix infrastructure

Install agreed containment and data-cable routes, coordinating risers, penetrations and interfaces with the relevant trades.

Explore this service ↗
02

CCTV second fix

Mount cameras and terminate connections once the agreed areas are ready, then verify positioning and recording dependencies.

Explore this service ↗
03

Access-control installation

Coordinate reader positions and door interfaces, fit the specified equipment and test the agreed operation.

Explore this service ↗
04

Alarm & network commissioning

Install agreed detection and network equipment, test connections and functions, and record the work for handover.

Explore this service ↗
Illustrative commercial developments site preparation and installation work
Planning the work around the site · Installation illustration

THE DETAILS THAT SHAPE DELIVERY

Planned before
the tools arrive.

Trade interfaces

Agree responsibilities for containment, power, doors, penetrations and making good.

Construction sequencing

Align cable work and equipment fitting with area readiness and finishing trades.

Handover requirements

Agree the test records, drawings and equipment information needed before commissioning begins.

FROM SURVEY TO SIGN-OFF

A clear sequence.
A complete installation.

We agree the equipment, responsibilities, access arrangements and required records before work begins.

  1. 01

    Coordinate the design

    Review drawings, device positions, routes and trade responsibilities.

  2. 02

    Complete first fix

    Install the agreed pathways and cabling before areas close up.

  3. 03

    Deliver second fix

    Fit devices, terminate racks and outlets, and label the installation.

  4. 04

    Commission & close out

    Run agreed tests, resolve snags and provide the specified handover records.

MORE THAN EQUIPMENT ON A WALL

Tested. Recorded.
Ready to hand over.

Handover is part of the installation scope. We agree the records and walkthrough your team needs to operate and maintain the system.

Discuss your handover requirements ↗

Your agreed handover can include

  • As-installed equipment and route information
  • Cable test and commissioning records
  • Labelling and equipment schedules
  • Snag status and agreed operating information

BEFORE WE START

Your site.
Your questions.

Can you work with the main contractor?

Yes. We coordinate the agreed installation scope with the construction programme and the relevant trade interfaces.

Can you cover first fix and second fix?

The scope can include pathways, cable installation, equipment fitting, termination and commissioning, with responsibility boundaries agreed in advance.

What do you need before quoting?

Drawings, specifications, programme dates, site details and the proposed division of responsibilities help define an accurate scope.

EuroTSI

LET’S PLAN THE INSTALLATION

Tell us about
your site.

Share the drawings, specification, programme and the first-fix or second-fix scope you need.

+353 212 066 591
info@eurotsi.com